Samsung Electronics
3-5
3-2-2 Installation diagram of indoor unit and outdoor unit
Operating Instructions and Installation
A Indoor unit gas leak test check point
Indoor unit
Piping
Tape vinyl
Piping may be laid to the rear, left,
right or down.
Right
Rear
Rear
Down
Left
B Drain hose installation
Cut the piping hole
sloped slightly
Remote control
A
B
250mm
or more
200mm or more
Remote control holder
Outdoor unit check point.
A-UNIT
B-UNIT
Piping (Liquid) 1/4"
Clamper tube
Piping (Gas) 3/8" or 1/2"
Installation plate
Installation tube
Pipe-connection
Vinyl tape
Screw
Putty
Drain hose
1
2
3
4
5
6
7
8
9
10
3
2
1
5 6
7
8
9
4
1 0
Summary of Contents for AM18A1(B1)E09
Page 2: ...Samsung Electronics Co Ltd DEC 1998 Printed in Korea Code No DB81 10176A 2...
Page 4: ...1 2 Samsung Electronics MEMO...
Page 8: ...2 4 Samsung Electronics MEMO...
Page 24: ...3 16 Samsung Electronics MEMO...
Page 38: ...Samsung Electronics 6 1 6 Exploded Views and Parts List 6 1 Indoor Unit...
Page 40: ...Samsung Electronics 6 3 6 2 Outdoor Unit 11 10 2 10 3 10 5 10 4 10 1 10...
Page 44: ...6 7 Samsung Electronics MEMO...
Page 46: ...Samsung Electronics 8 1 8 PCB Diagrams 8 1 Main PCB...