46
Performing leak test & insulation
Refrigerant pipe after EEV kit and MCU
t
Install the gas side and liquid side pipes, leave 10mm of space.
t
When contacting the gas side and liquid side pipe, use 1 grade thicker
insulator.
Gas pipe
10mm
10mm
10mm
Liquid pipe
t
Install the insulation not to get wider and use the adhesives on the connection part of it to prevent
moisture from entering.
t
Wind the refrigerant pipe with insulation tape if it is exposed to outside sunlight.
t
Install the refrigerant pipe respecting that the insulation does not get thinner on the bent part or
hanger of pipe.
t
Add the additional insulation if the insulation plate gets thinner.
t
Ensure that the pipe insulation is not crushed eg: on bends, where supported by hangers, where cable
ties are used.
Additional insulation
Hanger
Refrigerant pipe insulation
a×3
a
CAUTION