59
Step 5
Extract:
-
The valve spring,
-
The air valve,
-
The liner.
Step 6
Reassemble the liner on the new air valve.
Step 7
Reassemble the liner on the new air valve.
Grease the valve seals.
Step 8
Put the liner in place.
Screw on the liner.
560440001 :
PTFE grease 450 GR. box
560440101 : 10 ML GREASE PTFE CARTRIDGE
Summary of Contents for FPro G
Page 27: ...27 4 4 2 Visuals of the marking elements FPro G CONV FPro G LP FPro G GSP...
Page 55: ...55 Step 13 Raising the trigger Step 14 Feed in air and product...
Page 56: ...56 10 4 3 Replace air valve Step 1 Loosen the nut...
Page 60: ...60 Step 9 Back up The greased needle The needle spring The needle stop Tighten the nut...
Page 65: ...65 Step 1 To remove the hose apply pressure from top to bottom on the arrowed element...
Page 74: ...74 Step 3 Install the new anti drip membrane Step 4 Screw on the gravity cup by hand...