
14
Environment
Environmental risks must be controlled as follows:
-
Respect an average temperature of use of the equipment and
products, which must be at least 5°C lower than the flash point
of the products and within a range of 0 to 40°C.
-
Ventilation of the area by forced extraction and supply of
unpolluted air shall be mandatory during equipment operation
or cleaning operations.
-
Fragile parts of the installation, especially flexible hoses, must be
protected from mechanical or thermal damage during
production or maintenance.
-
Waste related to the operation or dismantling of the equipment
must be treated in accordance with the laws in force.
-
The noise level of our equipment is limited to the
maximum, however the operators will have to be protected
according to the overall noise level of the environment.
Depending on the operating conditions, the sound pressure of
the equipment may cause hearing problems. Take appropriate
measures to reduce noise pollution.
-
Dispose of packaging materials in a proper and
environmentally friendly manner.
Summary of Contents for FPro G
Page 27: ...27 4 4 2 Visuals of the marking elements FPro G CONV FPro G LP FPro G GSP...
Page 55: ...55 Step 13 Raising the trigger Step 14 Feed in air and product...
Page 56: ...56 10 4 3 Replace air valve Step 1 Loosen the nut...
Page 60: ...60 Step 9 Back up The greased needle The needle spring The needle stop Tighten the nut...
Page 65: ...65 Step 1 To remove the hose apply pressure from top to bottom on the arrowed element...
Page 74: ...74 Step 3 Install the new anti drip membrane Step 4 Screw on the gravity cup by hand...