VERS. 2017.06.01.
CG 252_MAN_EN
19
6
MAINTENANCE AND SERVICING
In order to maintain a quality in time, during the preparation of your floors and for a safe
operation and without any problems of the machine, please follow the maintenance plan
below:
B
eg
in of
t
he
da
y
D
urin
g t
he
cha
ng
ing
of
too
l
En
d
o
f
th
e
d
a
y
o
r m
o
re
o
ft
e
n
i
f
re
q
u
ire
d
E
very
w
ee
k
A
ft
er
a f
au
lt
A
ft
er
a dam
ag
e
Machine assembly
Contrôle visuel (état
général, étanchéité)
Clean
Tool and removable casing
Clean
Motor cooling fan
Clean
Motor housing
Clean
Reachable nuts and screws
Tighten up
Maintenance of the machine
Always perform the maintenance of the machine with the machine isolated from the
electrical supply and with tools idle.
Lubrication
The NORTON machines are equipped with bearings lubricated for life. It is therefore
unnecessary to grease or oil the machine, except the places fitted with a grease fitting.
Check and change of the flexible coupling
To check the condition of the flexible coupling you can simply proud you to the wear of your
tool. If you notice a wear not uniform on the tool (part of beveled tool), see traces more
pronounced on your ground it may be time to replace the flexible coupling.
In effect this are the first causes directly related to the wear of the flexible coupling.
To change the flexible coupling disconnects the machine from the electrical network and
then chock the machine to the change tool position (section 3.1).
Disassemble the tool in loosening the appropriate screws, and then remove the protective
casings and loosen the screws of the bracket plate and of the flexible coupling.
Replace then with a new flexible coupling, and then reassemble the while taking care to
reassemble the protective casings while checking their proper functioning.
Cleaning of the machine
Your machine will last longer if you clean it thoroughly after each day of work.