PSI
0753
Improving the operation of 2nd Bow.
Also see Step C of Customer Satisfaction Campaign
420.
Parts:
Rubber plug (2)
46 96 175
Figure
3. Gluing rubber plug
1.
Glue the rubber plug, P/N 46 96 175, to the head of the pop rivet securing the second bow’s stop. See Fig-
ure 3.C.
Page 4 of 24