54
April 2015
IMO_374_EN_v1
Roto Patio Fold
Subject to change.
Installation
Frame
Installing roller track and guide track
Bottom running
39+A
A
34+A
A
48+A
A
Dimension "
Y"
Dimension "
Y"
34+A
A
Dimension "
Y"
Dimension "
Y"
unten laufend
oben laufend
Top running
Bottom running
A coverage
Dimension Y
Dimension Y
Overlap clearance
Bottom
Top
5
4
8.5
6
3
9.5
7
4
10.5
8
5
11.5
Top running
A coverage
Dimension Y
Dimension Y
Overlap clearance
Bottom
Top
5
4
8.5
6
9.5
12
7
10.5
13
8
11.5
14
1.
Carry out the frame drillings for the roll-supports
(2 drillings per metre for roller track and 1 per metre
for guide track), with drilling jig (314417) and screw-
fix the rollers.
2.
Drillings for guide track:
Drilling jig for narrow track
Drillings for roller track:
Drilling jig for broad track
3.
Cut the bottom roller track to size:
Size = Frame external width –6 mm
4.
Cut the guide track to size:
Size = Total width
5.
Place the roller tracks on the rollers from the top and
slide them in place according to the illustration.
6.
Predrill the mounting holes Ø 3 mm.
7.
Screw-fix the tracks.
2.
B2
B1
NOTE!
Depending on the required
distance, choose B1 or B2.