background image

x

 Safety

6

BA ROTEX GSU - 09/2007

Hydraulic system connection

• When operating the ROTEX GasSolarUnit, especially when using the solar energy, the storage tank temperature can exceed 

60 °C. Protection from scalding (hot water mixing device e.g. VTA32 

 

15 60 16

) should therefore be included when 

installing the system.

Device installation room

• Operate ROTEX GasSolarUnit only if sufficient combustion air supply is ensured. If you operate the ROTEX GSU in ambient-

air-independent mode with an air/ flue gas system (LAS) dimensioned according to ROTEX standard, this is guaranteed 
automatically and there are no further conditions to be met in the device installation room.

• Make sure that there is an opening to the open air for air inlet, of at least 150 cm

2

 if you operate in the ambient air dependent 

mode.

• Do not operate the burner in the ambient air dependent mode in rooms with aggressive vapours (e.g. hair spray, perchloroeth-

ylene, carbon tetrachloride), heavy dust formation (e.g. workshops) or high humidity (e.g. laundries). 

• Always maintain the minimum distances from walls and other objects (see Chapter 7.1).

Operation

• Operate ROTEX GasSolarUnit only with the storage tank filled to overflow.
• Operate ROTEX GasSolarUnit only with closed silencer hoods.

Instruction by the installer

• The handover includes instruction in the operation and control of the ROTEX GasSolarUnit by the installer, using the operating 

instructions.

• Document the handover by filling in and signing the attached installation and instructions form together with the installer.

Disposal

• Through the environmentally-friendly design of the ROTEX GasSolarUnit, ROTEX has complied with the standards for 

environmentally-friendly disposal.

• Proper disposal in compliance with the respective national stipulations of the country of use is the responsibility of the owner.

Documentation

• The technical documentation contained in the scope of supply is part of the device. It must be stored in such a way as to 

ensure that the operator or technical personnel can always refer to it.

Summary of Contents for GSU 320

Page 1: ...fied solar storage tank Operating instructions Type Rated thermal output ROTEX GSU 320 3 20 kW modulating ROTEX GSU 520S 3 20 kW modulating ROTEX GSU 530S 7 30 kW modulating ROTEX GSU 535 8 35 kW modu...

Page 2: ...y invalidate the guarantee claim Dispatch and transport damage are excluded from the guarantee offer The guarantee explicitly excludes follow up costs especially the assembly and disassembly costs of...

Page 3: ...LPHA 23R 20 4 2 Heating mode 22 4 2 1 Manual setting of the boiler temperature 22 4 2 2 Pump setting for energy saving operation 22 4 2 3 Information on operating noises 23 4 3 Temporary shutdown 24 4...

Page 4: ...of the Control 1 2 Warnings and explanation of symbols Meaning of the warnings The warnings are classified in this manual according to their severity and probability of occurrence Special warning sym...

Page 5: ...anufacturer This is the case for example with original spare parts 1 5 Instructions for operating safety Heating system Work on the heating system e g installation connection and the initial start up...

Page 6: ...roeth ylene carbon tetrachloride heavy dust formation e g workshops or high humidity e g laundries Always maintain the minimum distances from walls and other objects see Chapter 7 1 Operation Operate...

Page 7: ...nnection alternatively condensate overflow connection to the front 21 Heating circulation pump 22 Gas fan burner 23 3 way diverting valve 24 Inflow temperature sensor 25 Return flow temperature sensor...

Page 8: ...verflow connection 12a Top filling connection alternatively condensate overflow connection to the front 13 Condensate drain hose by others 14 Condensate pipe 15 Heating heat exchanger boiler body 16 D...

Page 9: ...r 12 Condensate overflow connection 12a Top filling connection alternatively condensate overflow connection to the front 13 Condensate drain hose by others 14 Condensate pipe 15 Heating heat exchanger...

Page 10: ...environment around the burner is not sucked in The heating room can therefore can also be used as a work room laundry or for similar purposes Possible to install as central roof unit and in garages Th...

Page 11: ...ement connection OUT outlet gas pressure 11 Set screw for gas air mixture 12 Set screw for gas pressure controller under cover cap 13 Burner flange 14 1 Ionisation electrode 14 2 Ionisation cable 15 1...

Page 12: ...c firing units of the gas burner The CVBC automatic firing unit calculates the necessary burner output from the target value and the values of the flow and return flow temperature sensors The determin...

Page 13: ...nk charging circuits The required temperature sensors need to be ordered separately mixer circuit docking sensor TMKF 15 60 62 storage tank temperature sensor TSF 15 60 63 Flue gas temperature sensor...

Page 14: ...rom the storage tank water on its way up The direction of throughflow by the countercurrent principle and the spiral shape of the heat exchanger creates a distinct temperature layering in the storage...

Page 15: ...r with modulating gas burner the integrated circulation pump 3 way switch valve internal temperature sensors in the device inflow return flow storage tank safety group and ball cock The document folde...

Page 16: ...The construction must include a protective device against mechanical damage vehicle for the entire system e g a bracket or deflector 3 3 Initial start up The technical staff can commission the ROTEX G...

Page 17: ...its direct heating circuit mixer circuit and a storage tank charging circuit A more detailed description is given in the documentation of the ROTEX Control It is part of the scope of supply of the ele...

Page 18: ...am Selection of one of the 3 pre installed timer programs P1 P2 or P3 You can find further instructions and a more exact description in the documentation for ROTEX control It is part of the scope of s...

Page 19: ...active operating mode marking bar 4 1 2 Display and modification of parameters Standard display Modifying parameters All parameters for the operation of the heater system can be displayed and set on t...

Page 20: ...al 16 Fastening catch for control 17 Button 18 Button 19 Suppression button Figure 4 3 Operating elements on the boiler control panel with integrated control ALPHA 23R STAND BY Frost protected shutdow...

Page 21: ...and keys for longer than 2 seconds activates the Emission measurement Simultaneously pressing the and keys activates the Switching time programming for the switching time program I for more detailed i...

Page 22: ...stem Additional pumps are needed only if mixed heating circuits are installed Depending on the heat requirement and design temperatures of the heating system the pump can also be operated at a reduced...

Page 23: ...Air suction noises are generated in ambient air dependent operations The noise level can be effectively reduced by using a silencer 15 45 77 pR Residual discharge head mH Flow rate Figure 4 6 Residual...

Page 24: ...hat the hose opening is just above floor level Drain the heat exchanger in siphon mode 4 4 Re commissioning If the ROTEX GasSolarUnit has not been in operation for a long time you have to carry out a...

Page 25: ...eck the water pressure on the pressure gauge again and top up with water if necessary Close the KFE cock remove the filling hose and return flow inhibitor from the filling and draining fittings Functi...

Page 26: ...dirt filter installed in the heating return flow Yes 9 Is a membrane expansion tank fitted according to specifications and of the requisite size Yes 10 Is the safety valve connected to a free outlet...

Page 27: ...n the maintenance log The maintenance log is included in the scope of delivery 5 2 Inspection and maintenance tasks WARNING Improperly executed inspection and maintenance jobs can put human life and h...

Page 28: ...e silencer hood WARNING Improperly carried out work on power or gas conducting components can endanger human life and health and adversely affect the operation of the GasSolarUnit Only heating enginee...

Page 29: ...art of the legally specified flue gas check DANGER OF EXPLOSION Escaping gas is a direct threat to human health and life Even a few sparks can cause major explosions Only heating specialists trained a...

Page 30: ...19 maximum 5 times hr If there are several fault shutdowns successively you must check the heating system e g flue system fuel supply Please contact a specialised heating company Non interlocking fail...

Page 31: ...ble burnt 1 Establish cause and eliminate it 2 Replace ignition cable Automatic firing unit faulty Replace automatic firing unit Burner fan not starting despite burner demand No mains voltage on burne...

Page 32: ...de energised 13 0 Hot water storage tank temperature sensor Interruption 13 1 Short circuit 14 7 Modem contact Fault signal 15 7 Burner blockage contact Fault signal 16 0 Flue gas temperature sensor...

Page 33: ...sensor interruption The resistance of the outside temperature sensor is high or the calculated value is above 130 C The system continues to work with a constant outside temperature value of 0 C until...

Page 34: ...es operation only after the measured value last for longer than 1 sec 30 3 Burner failure does not switch on There is a burner demand However no burner counter signal oil or burner flame signal gas co...

Page 35: ...nly possible if the valve drive was previously set to the Heating position In the event of failure or incorrect settings of the electronic control emergency heating operation can be maintained Press t...

Page 36: ...7 1 Installation dimensions for flue gas connection towards rear for values see Tab 7 1 A View from the side B View from the front C View from above Figure 7 2 Installation dimensions for flue gas co...

Page 37: ...ith ball cock 1 female 4 Heating return flow pipe thread with ball cock 1 female 5 Solaris flow pipe thread flat sealing 1 SN A front B rear Figure 7 3 Connecting dimensions for heating and hot water...

Page 38: ...ng inflow and return flow with ball cock Inch 1 FT 1 FT 1 FT 1 FT Tab 7 2 Standard data of ROTEX GasSolarUnit Type 1 GSU 320 GSU 520S GSU 530S GSU 535 Parameter Unit Efficiency characteristic NL accor...

Page 39: ...er efficiency 110 Tab 7 4 Heat generator characteristic data 1 Type 2 Unit type 3 Product ID CE number 4 NOx class 5 Rated thermal load 6 Nominal output 7 Operating country 8 Voltage supply 9 Electr p...

Page 40: ...sible burner loads of ROTEX GSU pR Residual discharge head mH Flow rate heating system Figure 7 6 Residual discharge head GSU 320 and GSU 520S on heating side pR Residual discharge head mH Flow rate h...

Page 41: ...nt with reference to burner output P for GSU 320 and GSU 520S O2 content or CO2 content Figure 7 9 Flue gas setpoint values for burner adjustment with reference to burner output P for GSU 530S O2 cont...

Page 42: ...sistance Flue gas temperature Figure 7 12 Resistance characteristics of the temperature sensor Sensor Temperature sensor Measured temperature in C 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 Sensor...

Page 43: ...or with connected burner cable voltage supply for automatic firing unit and burner fan 29 Modulating gas burner automatic firing unit 30 7 pin circuit board connector for connecting a mixer motor and...

Page 44: ...OTEX GSU 09 2007 Circuit diagram Connection cable colours bl blue br brown ye yellow gn green gr grey rd red bl black wt white n a contact not assigned Figure 7 14 Circuit diagram GasSolarUnit shown o...

Page 45: ...x Notes 45 BA ROTEX GSU 09 2007...

Page 46: ...Notes 46 BA ROTEX GSU 09 2007...

Page 47: ...from the heating boiler to the heating surfaces and back again Heating return flow Section of the heat circulation which conducts the cooled water through the pipe system from the heating surfaces in...

Page 48: ...for ROTEX Control Press manual key Fig 4 1 item 13 The gas condensing boiler controls the maximum boiler temperature for a period of 20 minutes Press the manual key again The gas condensing boiler reg...

Reviews: