DANGER
12.Electrical connections
Risk of electrocution. Faulty elect-
rical work may lead to critical injury
and also to damage to property.
Always follow the instructions below.
Proper installation and commissioning must
be documented in the inspection logbook.
Use the form "Initial safety inspection before
installation“
12.1 Safety instructions for connecting
power cables
•
Electrical connection work may only be carried
out by qualified electricians.
•
Before commissioning, check the mains voltage
of the building wiring. This must match the
specified post lift voltage (→
see Annex or wiring
diagram in the control box).
•
The connection to the mains supply must be
hard-wired!
The mains supply cable from the fuse box to the
control box of the post lift must be hard-wired
according to the wiring diagram. No plug outlets
must be used.
•
The motor is designed for clockwise phase rota-
tion. The direction of rotation must be checked
during connection (if necessary, reverse the po-
larity!).
•
Pneumatic connection work may only be carried
out by qualified electricians.
•
For LT lift with 2 air valve ,one air valve with black
air hose for main lift ,and one air valve with blue
air hose for lifting table. (
→
Annex,pneumatic
circuit diagram)
•
Assemble the Air maintance(2) with screws,
connect the air hose (dia 6 mm)from control
box using fiting (3), air supply (dia 8mm )from
workshop using fitting (4),at last using the black
plastic cover(1) to cover all cables,hose,air hose
with screws(5) two side of column.
Black air line for main lift ,blue air line for lifting table
44
43
11.13 Assemble the pneumatic compents
4. Open the tank cap and fill the tank with 11 liters
of hydraulic oil. For approved hydraulic oil types,
see Chapter 9.4.