42
10. Transport, Storage
Crushing and shearing hazard for
limbs when unloading.
Caused by collapsing or slipping of
the load.
Only unload the packing unit and transport
to the installation site with a forklift truck or
pallet jack with a sufficient load capacity.
Only use hoists approved for the total weight
(straps, chains etc.).
Attach these so that the load cannot slip
(check the center of gravity of the load).
Only secure individual components to load-
bearing parts. Always lift vertically, steadily
and without jerking.
Carry out a visual inspection before
offloading.
Do not stand close to or underneath swinging
loads.
Constantly monitor the danger zone when
lifting or lowering.
Always transport hydraulic components
empty of oil.
Lift components may be damaged
if offloaded incorrectly.
Do not damage plates on the underside of
the lift when lifting.
Several parts are inserted into the compon-
ents, for example into the runways. Offload
these carefully to prevent damage.
When offloading, proceed from top to bottom.
10.1 Transport
The lift is supplied in a packing unit (base unit)
plus a separate hydraulic power unit. The optional
wheel alignment kit is also supplied in a packing
unit. The respective packing unit comes with the
following documentation:
•
Transport description giving suitable suspension
points, total weight, centre of gravity, required
cable lengths, transport locks, etc.
•
List of all individual components included in
delivery.
1
2
3
4
5
5
←←
6
← ←
1. Lift column with control unit
2. Drive-on ramps
3. Cross beams
4. Lift columns
5. Tracks(runways
6. Control box