System supply
WARNING!
Warning of missing protective device!
When operating via the system supply, the entire supply line from the power
generator via the connecting cable to the feed point in the electrical
distributor board is NOT protected by a personal protective device.
Only supply according to DIN 14684
All current-carrying components must be in a technically perfect and
faultless condition.
Check all electrical functions on the building before supplying.
To avoid possible damage, it is recommended to disconnect all
electronic devices in the building from the mains.
The building feed is an emergency power supply.
Only connect sockets with a special 1 o'clock coding to the
400 volt
emergency socket for building feed
.
► The sum of the power of the devices that can be switched on in the
building must not exceed the power of the generator.
► Pay attention to devices that switch on automatically, e.g. water
pumps or compressors.
► Lay the connection cable from the power generator to the supply point
and do not connect it to the building yet.
► Do not exceed the maximum network length of 100 metres including
connecting cable.
► Disconnect longer runs than 100 metres at the electrical distributor in
the building via individual circuit breakers.
► Start the generator in direct supply and operate it for at least 20 sec-
onds.
The power generator and the connected connection cable are
checked for insulation faults.
► Deactivate ECO mode if necessary.
See chapter "ECO mode (speed reduction)".
► Switch the
Direct supply/building feed
switch to Position 0.
The sockets on the power generator are de-energised.
The cables can be connected without danger.
► Connect the connection cable to the supply point of the building.
► Switch the
Direct supply/building feed
switch to Position 2.
The building feed of the generator is activated.
The 400 volt emergency socket for building feed is supplied via the
generator.
All other sockets are de-energised.