Commissioning
Chapter 4
Important Note for
Commissioning Engineer
The Commissioning Engineer is advised to go through this commissioning
package and follow the steps outlined herein to commission PowerFlex 7000
drive(s). It is the responsibility
of the commissioning engineer to complete all
datasheets included in this package and collect any other relevant information
that may not have been included in the package.
Anything that is not clear, please contact MV Tech Support for assistance:
Phone:
519-740-4790
Option 1
for technical and
Option 4
for commissioning questions
or
After successful commissioning of the drive, the commissioning engineer is
required to return the completed commissioning package along with his field
service reports to the project manager within one week after completion of job. If
job is not completed and some data collected it must be sent to project manager
within one week after leaving the site. The items listed below MUST be included
when submitting the commissioning package.
1.
All checklists and tables in this document (commissioning checklist,
customer data, motor data, daily service summary, etc.)
2.
Harmonics waveforms must be captured on AFE drives under drive-not-
running and full-load conditions
3.
DC current test waveforms (dc voltage and dc current) and variables while
running DC test
4.
Load Test waveforms (line and load voltage and current waveforms at 50%
and 100% load or whatever maximum load and speed allowed by the
customer)
5.
Final drive parameter settings and variables (running motor at max speed
and load) captured at
SERVICE LEVEL ACCESS
.
6.
Modified PLC program (if applicable)
7.
Synchronous transfer waveforms (for synchronous transfer applications)
8.
Marked-up drawings
9.
Summary of issues/failures encountered during commissioning
All documents and data files (waveforms, parameter settings, variables, trend
data, etc.) submitted by the commissioning engineer must be properly named,
labeled and organized.
IMPORTANT
Important guidelines for capturing waveforms are also included in the package
for quick reference. These must be reviewed and followed properly by the
commissioning engineer.