50
Appendix
Operating manual neoTower® Premium L / 03.2017
Product designation
neoTower® 50.0
Standard
High temperature
Calorific value
12.4.18 Method of operation
B
Mains parallel, heat operated / standalone operation voluntary emergency
power optional
B
Use of electricity: Own requirement and infeed into the grid of the energy
supply company, optional electricity-optimised modulation
B
Heat usage automatically regulated in monovalent or bivalent operation with
buffer tank; optionally heat-optimised modulation
B
Internet connection
12.4.19 Indicators and switches/buttons
B
Operation of the internal control and monitoring programs via central control
unit (touchscreen for quick access to important functions)
B
Back-lit 10.1” graphical colour display with visualised system diagram and
indicators for:
B
Temperature memory (3x)
B
Motor
B
Return line
B
Hot water
B
Interior
B
Oil
B
Generator bearing (2x)
B
Flue gas
B
Indicator for current power, water pressure, operation hours, generated
energy, maintenance instructions and error notifications
B
Switches/buttons:
B
Master switch
B
Emergency stop
B
Electric vehicle (Efz) charging data button
B
Maintenance button
12.4.20 RMB/Report
B
Global live data tracking visualised in installation diagram
B
Individual password protection
B
Data logging with daily, weekly, monthly and annual report in graphical format
B
Remote maintenance
B
Remote monitoring, evaluation and reporting
12.4.21 Water quality
B
Motor circuit: 40% glycol, 60% water per VDI Regulation 2035
B
Water pressure: 0.8 bar.
B
Heating circuit (“secondary circuit”):
Free from mechanical impurities and as a minimum in accordance with
the Group 2 quality requirements of VDI Regulation 2035 (in particular
hardness < 0.11 °dH)