27
Assembly
Operating manual neoTower® Premium L / 03.2017
The connection of additional components depends on the
heating system.
D
“12.1 Hydraulic diagrams” (page 36).
A
Connect any additional components (e.g. peak load
boiler, servomotor, storage tank pump) to the control
mechanism.
Once all components have been connected:
A
Fuse the supply voltage.
A
Connect the supply voltage to the control cabinet.
A
Close the control cabinet.
4.3.11 Checking the connections
Once the assembly process is complete, the following points
must be checked:
B
Leak-tightness of all lines.
B
Flexibility of all lines to the generation unit.
B
Tight fit of all connections in the control cabinet.
B
No damage, kinks or pinches in the cabling and lines.
B
The siphon of the condensate drain is filled with water.
A
Check the system.
If the exhaust air or flue gas is extracted in combination with
another heat source (peak load boiler or another system):
A
Ensure that the system is fitted with a suitable backflow
preventer.
Following assembly, the commissioning of the system can
be arranged with the manufacturer (or a specialist partner
authorised by the manufacturer).
A
Complete the commissioning request.
D
“12.2 Commissioning request” (page 39).
A
Arrange a time and date for the commissioning.