![RMB/Energie neoTower Premium L Operating Manual Download Page 22](http://html1.mh-extra.com/html/rmb-energie/neotower-premium-l/neotower-premium-l_operating-manual_1467279022.webp)
22
Assembly
Operating manual neoTower® Premium L / 03.2017
A
Connect the line to the return line of the buffer tank.
A
Connect the line to the “Buffer water return line”
connection (inlet) on the calorific value heat exchanger.
Buffer water supply line
A
Connect the line to the supply line of the buffer tank.
A
Connect the line to the “Buffer water supply line”
connection on the generation unit.
Condensate
The line for the condensate water must be corrosion
resistant.
The line must have a sufficient gradient between the
generation unit and the drain.
A
Connect the line to the “Condensate” connection on the
generation unit.
A
Connect the line to the condensate drain.
The line for the condensate water must be corrosion
resistant.
The line must have a sufficient gradient between the
calorific value heat exchanger and the drain.
A
Connect the line to the “condensate” connection on the
calorific value heat exchanger.
A
Connect the line to the condensate drain.