23
Assembly
Operating manual neoTower® Premium L / 03.2017
Flue gas
The line must be laid with a sufficient gradient to the
generation unit.
A
Connect the line to the “flue gas” connection on the
generation unit.
A
Connect the line to the “flue gas” connection (inlet) on
the calorific value heat exchanger.
A
Ensure that the line is not interrupted (e.g. that it does
not slip out of vertically installed parts).
A
Ensure that the connection piece (optionally available)
cannot vibrate out of place.
The line must be laid with a sufficient gradient to the
calorific value heat exchanger.
A
Make sure that a suitable flue gas silencer (optionally
available) is present:
B
In the flue gas routing.
B
In close proximity to the generation unit.
B
With horizontal installation with correct discharge of
the condensate water.
A
Connect the line to the “flue gas” connection (outlet) on
the calorific value heat exchanger.
A
Connect the line to the flue.
A
Ensure that the line is not interrupted (e.g. that it does
not slip out of vertically installed parts).
A
Ensure that the connection piece (optionally available)
cannot vibrate out of place.