SteelConnect SDI-5030 Gateway Hardware Installation Guide
13
2
Installing the SteelConnect SDI-5030
Gateway
This chapter describes how to install or mount the gateway and discusses the following topics:
“Site preparations or considerations” on page 13
“Required tools and equipment” on page 14
“Rack mounting the SteelConnect SDI-5030” on page 14
“Powering on the gateway” on page 20
“Connecting to the network” on page 21
Site preparations or considerations
Before you install the SteelConnect SDI-5030, make sure that your site meets the requirements
suggested in this section.
“Site requirements” on page 13
“Safety information” on page 13
“Environmental considerations” on page 14
Site requirements
A standard electronic environment where the ambient temperature doesn’t exceed 45
º
C (95
º
F)
and the relative humidity doesn’t exceed 90% (noncondensing).
Ethernet connections are available within the standard Ethernet limit.
A clean power source is available, dedicated to computer devices and other electronic equipment.
The rack is a standard 19-inch Telco-type mounting rack.
Safety information
Carefully inspect the work area in which the0 gateway will be located to ensure against hazards
such as damp floors, ungrounded power extension cords, and missing ground connections.
Before you connect the gateway to power, locate the power off switch on the gateway and locate
the main circuit breaker for the room in which the gateway is installed. If an electrical accident
occurs, turn power off immediately.
Before operating the gateway, ensure that external power sources comply with the requirements.