6 Maintenance and care
36
Rittal Perforex BC machining centre
EN
6.4 Maintenance schedule
The following maintenance schedule provides an overview of the prescribed
inspection, checking and maintenance work.
Interval
When
required
Day
Week
(50 h)
Month
(200 h)
3 months
(600 h)
Lubricant
information
Inspection, checking, possibly re-
placement
- Electrical system
X
- Protective devices
X
- Maintenance unit
X
- Gear rack drive
X
- Tool holder
X
- Enclosure cooling filter
X
- Swarf extraction filter bag
X
Cleaning
- Machine in general
X
- Gear racks
X
- Linear guides
X
- Pressure fixture, incl. pressure rollers
X
- Swarf container on spindle
X
- Tool holder
X
- Sinter filter of the maintenance unit
X
- Light array
X
- Hollow shaft
X
Lubrication
- X, Y, Z axis linear guides
X
2
(see section 6.4.2)
- Gear racks
1
(see section 6.4.2)
- Cuboid linear guides
X
2
(see section 6.4.2)
- Minimal lubrication
X
3
(see section 6.4.2)
- Pressure plate guide shafts
X
4
(see section 6.4.2)
- Pneum. plate clamp
X
4
(see section 6.4.2)
:
Maintenance schedule