Rinnai Australia
50
Sapphire Operation & Installation Manual
CHECKLIST
INSTALLATION AND COMMISSIONING CHECKLIST
•
Complete the Installation Check List and the Installer details below.
•
Instruct customer on the Sapphire operation.
•
Ensure the customer understands the content of this manual.
Checklist To Be Completed By Certified Gas Installer
Advise the customer that during the initial burning period of approximately 2 hours, some smoke
and odour may be experienced. During this period the heater should be operated on ‘High’ and
the space being heated should be well ventilated. It may take up to 20 minutes of operation for
the logs to achieve their full flame pattern and glow.
The glass dress guard fitted to this appliance reducing the risk of fire and injury and no part of it
should be permanently removed.
•
For protection of young children or the infirm a secondary guard is required.
•
Ensure this Operation and Installation manual is left with the customer.
Ensure the Customer understands that:
No part of this appliance should be permanently removed.
Paper or other material must not be burnt in this appliance.
Young children and the infirm should be supervised at all times.
NO / YES
1. Is the appliance positioned in a suitable location (clearances, combustible clearances, mantels and
surrounds etc)?
2. Was a Rinnai approved flue system installed and tested in accordance with the instructions?
3. Has the gas pressure checked and set?
4. Has the log set / burn media been installed as per instructions?
5. Was the appliance tested for correct operation and to ensure no gas leaks?
6. Has the customer been instructed on operating procedure and safety requirements?
7. Is the end-user fully aware of operating procedure?
8. Has the Glass Dress Guard been fitted?
9. Has the customer been advised not to remove the glass dress-guard?
10.Has the customer been advised to service the heater every two years?
NOTE
WARNING
WARNING