Rinnai Australia
40
Sapphire Operation & Installation Manual
HEATER ENGINE INSTALLATION - PLINTH
Step 4.
Attach Spigot Adaptor & Panels To Heater Engine
Assemble the the spigot adaptor halves
and
, secure together with
4 x screws (supplied).
Drill 4 x Ø 3.2mm holes in the pre pressed location dimples on the top and back of the heater engine, then fit the
flue spigot adaptor
to the heater engine top and rear panels using 4 - 8g x 10mm self tapping screws (supplied).
Fit the rear panel
using 9 - 8g x 10mm self tapping screws (supplied).
Fit side Panels
and
to heater body at the front and the rear panel using 12 - 8g x 10mm self tapping screws
(supplied).
Carefully align top panel
over tabs of the rear panel
, fasten to the heater at the front using 3 - M5 x 12mm
screws (supplied) and at the rear using 3 - 8g x 10mm self tapping screws (supplied).
Step 5.
Prepare Gas Supply
Remove the threaded brass plug from the S/S flexi pipe consumer gas supply pipe.
Step 6.
Fit Heater Engine To Plinth Assembly
Align the heater securing holes over the M5 root nuts, then secure using the 4 - M5 x 12mm screws supplied. Note
that two screws are located midway into the appliance on the lower left and right edges, refer to detail
above.
The following installation step requires a two man lift. Seek assistance before proceeding further.
Carefully lift the heater engine assembly
onto the plinth
assembly
ensuring that the gas supply pipe and fittings
feed into the rear access hole.
Take care that the electrical cord does
not bunch up or get pinched behind the
heater engine.
H
H2
L
J
K
I
I
H1
H1
H2
H
I
J
K
L
I
WARNING
N
E
M
N
N
F
M
E
F
CAUTION
N