Rinnai Australia
45
Sapphire Operation & Installation Manual
COMPLETING HEATER INSTALLATION
Step 7.
Connect the Push Button Control Panel
Carefully pick up fascia assembly taking care not tilt it on it's edge as the glass may slide out of the stand off posts.
Position the fascia close to the heater engine and connect the RJ45 plug
into the socket
located on the back
of fascia on the top left hand corner, (this connects the push button control panel via a communications cable to
the heater engine's control box).
Step 8.
Switch On the Electricity Supply
Switch on the electricity supply, the appliance is now ready for commissioning.
240 VOLTS, RISK OF ELECTRICAL SHOCK!
When performing the commissioning, the appliance electrical power will need to be connected.
Exercise CAUTION as there is potential for electric shock from the exposed wiring and circuitry.
DO NOT leave the appliance unattended when power is connected and the panels are removed.
Installation and commissioning must be carried out by an Authorised person.
Wiring inside this appliance may be at 240V potential.
DO NOT test for gas escapes with an open flame.
A
B
A
B
WARNING