RigMaster LG200 Installation Manual
Table of Contents
August 2010 RigMaster Power International Ltd LG200 Service Manual
Safety
Safety Information
Preface
Section 1
Introduction to Installation
Introduction to Installation
1:1:0
Definitions
1:1:1
Necessary Tools
1:1:2
Technical Assistance
1:1:3
Placement of the LG200 Components
1:2:0
Section 2
Preparation and Frame Rail Mounting
Preparing the LG200
2:1:0
Frame Mounting Hardware
2:2:0
Frame Rail Mounting
2:2:1
Section 3
Installing the Bunk AC Unit
Preparation to Install the AC Unit
3:1:0
Mounting the AC Unit
3:1:1
Ducting the Ventilation System
3:2:0
Independent Ducting
3:2:1
Vent Installation
3:2:2
Installation of Return Air Vent
3:2:3
Integrated Ducting
3:3:0
Section 4
Mounting the Control Panel
Mounting the Control Panel
4:1:0
Section 5
Installing the Coolant Hoses
Installation of the Coolant Fittings
5:1:0
Installation of the Coolant Hoses
5:2:0
Section 6
Installing the A/C Hoses
Installation of the A/C Refrigerant Hoses
6:1:0
Installing the A/C Hoses in the engine compartment
6:1:1
Installing the A/C hoses from the LG200 to the AC unit
6:1:2
Air Conditioning Specifications
6:1:3
Section 7
Installing the Fuel System
Installation of the Fuel System
7:1:0
Installation of the Fuel Fittings at the Fuel Tanks
7:2:0
Optional Fuel Pick Up Tube (Stand Pipe)
7:2:1
Installation of the Fuel Fittings at the LG200 APU
7:3:0
Prime the Fuel System
7:4:0