RigMaster LG200 Installation Manual
Section 12
August 2010 RigMaster Power International Ltd LG200 Service Manual
Installation Equipment List
Installation Material List
12:1:0
Installation Tools List
12:2:0
Shop Equipment List
12:3:0
12:1:0 Installation Materials List
Wire Loom 1/2 inch
Wire Loom
1 inch
Hole Saw 1 1/2 inch Hole
Saw 4 1/2 inch Hole Saw Arbor
with 3/16” Pilot
Polyurethane Insulating Foam (Small Can)
Black Plastic Wire Ties - 8 inch
Black Plastic Wire Ties - 12 inch
Thread Sealant
Standard Life Engine Coolant [Premixed 50/50 suitable for Aluminum Radiators]
Fuel Stand Pipes for 3/8 ID Fuel Lines [RP2-006 (Optional)]
Frame Grabber Mounting Clamps [RP10-001-28 (Optional) See Section 2:2:1]
Assorted Self Tapping Screws
Electrical Tape
12:2:0 Installation Tools List
Wrenches
Sockets 1/4” Drive
Screwdrivers
5/16”
1/4”
Flat Head (small-thin)
3/8”
5/16”
Flat Head (small)
7/16”
3/8”
Flat Head (medium)
9/16”
8mm
Flat Head (large)
5/8”
10mm
Philips Head (medium)
11/16”
3/4”
Sockets 3/8” Drive
Hole Saws
7/8”
7/16”
1 1/2 ” diameter
1”
1/2”
4 1/2 ” diameter
1 1/16 ”
9/16”
Arbor with 3/16 pilot
1 1/8”
17mm
10 mm
Other Tools
17mm
Sockets 1/2” Drive
Safety Glasses
8”Adjustable
1 1/16
Tape Measure (26’ / 8m.)
1 1/8”
Flashlight
Air Blow Gun
Ratchets
Extensions
Test Light (LED Type)
Air Ratchet
6” Extension [1/4” drive]
5/8”-1 1/2” Reamer
Impact Gun
12” Extension [3/8” drive]
8” Needle Nose Pliers
1/4 ” Drive Hand Ratchet
24” Extension [1/2” drive]
8” Square Nose Pliers
3/8 ” Drive Hand Ratchet
Channel Lock Pliers
1/2 ” Drive Hand Ratchet
6” Side Cutter
Torque Wrench [1/2” drive]
Wire Stripper/Crimper