5.7
Operation sequence of the burner
00
01
10
12
22
24
30
36
38
40
42
44
60
62
70
72
74
80
81
82
83
90
Pa
P
P
P
P
P
List of the phases
Ph00
Lockout phase
Ph01
Safety phase
Ph10
t10 = closure in pause
Ph12
Standby
Ph22
t22 = Uphill train of the fan motor (fan motor = ON,
safety valve = ON)
Ph24
The burner moves to the pre-purging position
Ph30
t1 = pre-purging time
Ph36
The burner moves to the ignition position
Ph38
t3 = pre-ignition time
Ph40
TSA1 = safety time 1 (ignition transformer ON)
Ph42
TSA1 = safety time 1 (ignition transformer OFF), t42 =
pre-ignition time OFF
Ph = Phase
Ph44
t44 = interval time 1
Ph60
Operation
Ph62
t62 = max. time to reach the low flame (the burner
moves to the switch-off position)
Ph70
t13 = post-combustion time
Ph72
The burner moves to the post-purging position
Ph74
t8 = post-purging time
Ph80
t80 = emptying time (valve leak detection)
Ph81
t81 = atmospheric test time (valve leak detection)
Ph82
t82 = filling time (valve leak detection)
Ph83
t83 = pressure test time (valve leak detection)
Ph90
Standby time due to lack of gas
Checking of
seal
Operation
Switching off
Start-up
t1
TSA1
Number of the phase
INP
U
T
S
IGNA
L
S
Thermostat/pressure switch
OUT
P
U
T
S
IGNA
L
S
Thermostat/pressure switch
Ionisation probe ION
Air pressure switch PA
Minimum gas pressure switch
Maximum gas pressure switch
Gas pressure switch for leak
detection PGVP
Alternative to leak detection CPI
safety TS
Fan motor MV
Ignition transformer TA
Shutoff valve
Safety valve V1
Adjustment valve V2
Pilot valve VP
Limit lockout
indicator TL
SERVO
M
O
TO
RS
ai
r
fue
l
90°
Nominal load
Pos. of post-purging
Ignition load
Low flame
Pos. without load
0°
90°
Nominal load
Pos. of post-purging
Ignition load
Low flame
Pos. without load
0°
Signal ON
Signal OFF
Any signal is allowed
Fig. 34
D7727
PGmin
PGM
Start-up, calibration and operation of the burner
5
Summary of Contents for RS 100/E MZ
Page 45: ...45 GB Appendix Electrical panel layout A ...
Page 46: ...46 GB Appendix Electrical panel layout A ...
Page 47: ...47 GB Appendix Electrical panel layout A ...
Page 48: ...48 GB Appendix Electrical panel layout A ...
Page 49: ...49 GB Appendix Electrical panel layout A ...
Page 54: ......
Page 55: ......