47
20081825
GB
Start-up, calibration and operation of the burner
6.13
Start-up procedure
Check that the Operator panel display shows the heat request
and
“OFF UP0”
for fuel 0 or
“OFF UPr1”
for fuel 1: this means it
is necessary to set the modulation curve of the burner.
Access the Parameters Level referring to “Access procedure with
password” on page 44.
The display screen displays the parameters group
400
.
Confirm with the key
“i/reset”
The display shows
“run”
Confirm with the key
“i/reset”.
The burner starts up.
The display shows all the phases and relative times in sequence.
The phases are listed in the section “List of the phases (gas op-
eration)” on page 21.
Phase 22:
Start of the fan motor.
Pump motor start-up (only for oil operation).
Phase 24:
The burner goes to the pre-purging position, the air servomotor
opens the damper at 90°.
Phases 80, 81, 82, 83 (only with gas operation):
These phases relate to the valve seal test.
Phase 30:
The count of the pre-purging time pre-set in the factory begins.
Phase 36:
The burner goes to its switch-on position, point “
P0
”, defined in
Tab. S on page 48: the display shows a flashing “
P0
” indication.
If the value proposed is adequate,
confirm using the “+” but-
ton
.
Otherwise, modify the ignition point (see the section “Procedure
for inserting and adjusting points on the modulation curve” on
page 46.
Phase 38:
The ignition phase begins and the spark goes off.
Phase 40:
The fuel valves open (the safety time count begins). Using the ap-
propriate visor check there is a flame and that the combustion pa-
rameters are correct. if necessary, vary the degrees of opening/
closing of the air and fuel servomotors.
If the control box goes into lockout, press the keys
“+”
and
“-”
(
ESC
) simultaneously: the display visualises alternately the lock-
out code for flame absence
c: 4
) and the relative diagnostic (
d:
3
).
Solve the problem, referring to the paragraph “Ignition failure” on
page 58.
To unlock, see “Reset procedure” on page 43. The display shows
“OFF UP0”
or
“OFF UPr1”
Repeat the
“Start-up procedure”
.
Once the ignition has occurred (point
“P0”
), proceed with the
calibration of the modulation curve.
20096077
h min s
%
V
P
h min s
%
V
P
D9023
P
V
%
s
min
h
/reset
2006441
4
WARNING
The values shown in the figure are purely for indi-
cation purposes.
WARNING
When operating with oil, the valves only open with
the consent of the minimum oil pressure switch. If
necessary adjust the minimum pressure switch or
check the fuel flow.
WARNING
The values previously inserted remain stored.
D9032
P
min
h
s
%
V
D90
0
7
D9008
P
%
s
min
V
h
P
h
V
min s
%
Summary of Contents for RLS 310/E MX
Page 2: ...Original instructions ...
Page 81: ...79 20081825 GB Appendix Electrical panel layout RLS 310 410 E MX 230 400V Direct Start Up ...
Page 84: ...20081825 82 GB Appendix Electrical panel layout ALL MODELS ...
Page 85: ...83 20081825 GB Appendix Electrical panel layout 0 ALL MODELS ...
Page 87: ...85 20081825 GB Appendix Electrical panel layout ALL MODELS ...
Page 94: ......
Page 95: ......