42
SHUTDOWN
42
APPENDIX
APPENDIX C - MAINTENANCE
A qualified and adequately trained technician must perform the
inspection as specified in these instructions before each heating
season and at regular intervals.
Servicing, inspection and adjustment must be done by a trained
technician in accordance with all applicable local, state and
national codes. Improper servicing or adjustment could damage
the boiler and result in equipment damage, injury, and/or
dangerous conditions.
MAINTENANCE / INSPECTION SCHEDULE
Time interval
Maintenance
Annually
Verify the cleanliness of the area around the
boiler
Annually
Check the pressure of the hydraulic system
Annually
Check vent piping and verify if leaks are
present
Annually
Check air piping and verify if leaks are
present
Annually
Check relief valves
Monthly (follow
local, state, federal
or local authority
having jurisdiction
guidelines)
Verify the condensate discharge system
Every two months Test low water cut off
Every two months Inspect and test the reset button of low
water cut off
Every six months
Check all piping (gas and water) for leaks
End of heating
season
Shut off the boiler
Annually *
Combustion test and analysis
Annually *
Verify condition of flue and air system
(including Venturi and fan)
Annually *
Check ignition electrode
Annually *
Cleaning the combustion chamber
(including the burner tube)
Annually *
Clean condensate discharge
Annually *
Safety block check, modulation range check,
gas valve closing after burner stop
Annually *
Check control parameters
Annually *
Check for gas piping leak
Annually *
Check wiring and connections
Annually *
Verify startup
Annually *
Verify the flame stability and signal strength
Annually *
Check relief valve
Annually *
Inspect the burner gasket
(*) Annually or every 2000 hours. Whichever occurs first.
Gas Leak Inspection
Verify all gas piping to ensure that there are no leaks.
9
DANGER
: To verify the gas leaks use a soap solution or a gas
leak detector. Do not use matches, candles, or other methods
that can cause explosions!
CHECK EXHAUST AND COMBUSTION AIR PIPE SYSTEM
Clear vent systems of any obstructions, corrosion, physical
damage, water stains, rust. Verify the connection between the
single components.
Verify the outside terminations are clear. Clean the screens and the
louvers if there is any debris.
INSPECTION OF IGNITION ELECTRODE
Verify that the electrode is clean of deposits and use an emery
cloth or other material to remove deposits as required.
0.315" - 0.394
"
0.118" - 0.197"
1
2
Fig. 55
Inspection of ignition electrode
No.
Description
1
Burner tube
2
Ignition electrode
CHECKING FOR WIRING AND CONNECTIONS
Check that all wiring is securely fastened and in good condition
without any cracking or alteration of the insulation or corrosion on
the metallic contacts.
BURNER GASKET INSPECTION
You must maintain the boiler as outlined in this manual and have
the boiler started up and serviced at least annually by a qualified
service technician to ensure boiler/system reliability.
This includes a combustion test and the cleaning of the combustion
chamber.
When disassembling the heat exchanger it is crucial to inspect the
Burner Gasket (part number 0CR105917) for damage.
It is a must to replace the burner gasket when servicing and if there
are any signs of wear, deformity or discoloration of the gasket and
in any case not later than every two years.
Summary of Contents for Array AR 3000
Page 1: ...cod Doc 0079789 rev 5 09 2018 Array AR 3000 AR 4000 US INSTALLATION AND OPERATION MANUAL...
Page 39: ...39 SHUTDOWN 39 APPENDIX WIRING DIAGRAM DEPENDENT 5 6 7 8 RIGHT DOOR...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71...