Preventive Maintenance
4-11
M M
L
0 0
4.3.6. Replacing the Conveyance Roller A and Pulley/F
Applicable jigs and tools:
⊕
Screwdriver, Jewel Screwdriver, Pliers.
[Disassembling Procedures]
1. Remove the Rear Cover.
(Refer to item 6.1.1 on page 6-1)
2. Remove the Pulley, Bel, Pulley/F, and Gear.
Figure 4-12. -1 Removal of the Conveyance Roller A and Pulley/F
3. Remove the E-Ring and the Shaft Holder from the Conveyance Roller A.
4. Remove the Conveyance Roller A.
Figure 4-13. -2 Removal of the Conveyance Roller A and Pulley/F
[Assembling Procedures]
1. Reinstall the Conveyance Roller A and Pulley/F by reversing the procedure above.
CAUTION:
Be sure to turn OFF the MAIN AC POWER prior to performing the maintenance.
BELT
PULLEY
PULLEY/F
GEAR
PULLEY/F
E-RING
CONVEYANCE
SHAFT HOLDER
SHAFT HOLDER
E-RING
ROLLER A
Summary of Contents for DDP70
Page 1: ...Standard Finisher Maintenance Manual 2005 Ricoh Printing Systems Ltd May 2005 N901402...
Page 4: ...i DDP70 Finisher Maintenance Manual Copyright 2005 Ricoh Printing Systems Ltd N901402...
Page 5: ...ii DDP70 Finisher Maintenance Manual...
Page 6: ...i Revisions Page Rev Machine Rev Page No Contents Date 00 First Edition May 2005...
Page 7: ...ii...
Page 8: ...Safety iii Safety Safety in Operation...
Page 9: ...iv DDP70 Finisher Maintenance Manual...
Page 13: ...iv DDP70 Finisher Maintenance Manual...
Page 17: ...1 4 DDP70 Finisher Maintenance Manual M M L 0 0...
Page 19: ...2 2 DDP70 Finisher Maintenance Manual M M L 0 0...
Page 49: ...4 20 DDP70 Finisher Maintenance Manual M M L 0 0...
Page 137: ...7 16 DDP70 Finisher Maintenance Manual M M L 0 0...