Manual CE (SAGOMA_GB)
Pressing
button 4
and
5
set the correct value (the suggested values are 85°C for Instant machines
and 92°C for Espresso machines).
Press
button
1 to confirm the data and then
key PROG
inside the machine to exit from
PROGRAMMING.
Switch off and on the vending machine using the safety switch. The display shows:
WARMING
PLEASE WAIT
Until the right temperature is reached inside the boiler. At the end of the operation the display will
shows:
rheavendors
SAGOMA
TAKE A RELAX
MOMENT
11.2 Phase 2 of the installation
The phase 2 of the installation of the vending machine contains the cleaning of the parts in contact
with foodstuff, the loading of the food products and the installation of some accessories.
11.2.1 Washing and disinfecting of components in
contact with foodstuff.
With the vending machine switched on, make sure that the display shows:
rheavendors
SAGOMA
TAKE A
RELAX MOMENT
Proceed to clean in sequence all the mixing bowls, pressing the
key PL
inside the machine on the
CPU protection and then button
s
from
1
to
5
(depending on how many mixing bowls the machine
has got). Use about 4 litres of water altogether. This will remove any possible trace of dirt from the
boiler for instant ingredients.
For models
E
and
FB
only, carry out cleansing operations of the coffee group by means of a
suitable cleaning product (refer to product instructions).
- pour the cleaning product in the group through the coffee funnel.
- carry out repeated washing cycles of the coffee group operating the
key PL
inside the machine
on the CPU protection pressing button 1. Dispense about 1.5 litres of water. This will remove any
trace of dirt inside the espresso boiler.
Wash hands thoroughly.
Prepare separately, in a suitable container, a disinfecting antibacterial solution of chlorine,
according to the instructions enclosed in the chemical.
21/21