11. User & operating instructions
To Start the Heater
1. Ensure gas supply is turned on.
2. Electrical supply to the controls is on.
3. Ensure that the controls are correctly set
i.e.; Clock is correctly set. Heater program
is correctly set. Required room temp is
correctly set
4. Once the heating controller ‘calls for heat’
power will be supplied to the heater(s).
The red neon will then illuminate.
5. After a pre-purge period of 10 seconds the
burner will ignite and the amber neon will
then illuminate.
6. If lockout occurs press the lockout
reset button (if available), or switch off
electrical supply and restart after 15
seconds.
7. If lockout occurs three times
consecutively switch off and isolate the
gas and electricity supplies.
Contact your local representative
To Switch Off Heater
1. Switch off electrical supply to the heater.
The burner will stop and the fan will shut
off.
2. If the heater is to be switched off for
periods in excess of one week it is highly
recommended that both the gas and the
electrical supplies are turned off.
Routine Maintenance between Service Intervals
After ensuring that the heater is cold and
mains electric isolated, cleaning of the
reflectors with a soft cloth and a mild deter-
gent (non solvent based cleaners only) in
water can be undertaken.
Additional removal of dust from the radiant
tubes, and burner can be undertaken.
Frequency of Servicing
The manufacturer recommends that to
ensure continued efficient and safe opera-
tion of the appliance, the heater is serviced
annually by a competent person e.g. every
year in normal working conditions but in
exceptional dusty or polluted conditions
more frequent servicing may be required.
The manufacturer offers a maintenance
service. Details are available on request.
For service requirements, please contact
your local representative
For further technical and service support
visit our Support Information Database at
www.s-i-d.co.uk
58
Summary of Contents for VS15LHE8
Page 34: ...A Figure 41 Vision Heater Assembly Models VSUTE VSUHE 15kW 76mm 3ins Nom Dia 34...
Page 35: ...A A Figure 42 Vision Heater Assembly Models VSUTE VSUHE 20 25kW 76mm 3ins Nom Dia 35...
Page 36: ...Figure 43 Vision Heater Assembly Models VSUTE VSUHE 30 35kW 100mm 4ins Nom Dia 36...
Page 37: ...Figure 44 Vision Heater Assembly Models VSUTE VSUHE 40kW 100mm 4ins Nom Dia 37...
Page 38: ...Figure 45 Vision Heater Assembly Models VSUTE VSUHE 45 50kW 100mm 4ins Nom Dia 38...
Page 39: ...A Figure 46 Vision Heater Assembly Models VSLIE VSLHE VSDLE 15 25kW 8m 76mm 3ins Nom Dia 39...
Page 40: ...A Figure 47 Vision Heater Assembly Models VSLIE VSLHE VSDLE 20 25kW 10 5m 76mm 3ins Nom Dia 40...
Page 41: ...Figure 48 Vision Heater Assembly Models VSLIE VSLHE VSDLE 30 35kW 10 5m 100mm 4ins Nom Dia 41...
Page 43: ...Figure 50 Vision Heater Assy Models VSLIE VSLHE VSDLE 35 40 45 50 kW 16m 100mm 4ins Nom Dia 43...
Page 59: ...Notes 59...