STEP 4
Slacken the grub screw on the burner support
casting using a 4mm Allen key to enable the
burner to be removed from the radiant tube.
Carefully remove the burner to prevent it or
any components from falling to the ground and
position the assembly in a safe area.
4.4 Burner gas injector servicing
STEP 1
Remove the burner support casting and gasket.
STEP 2
The burner head assembly can be removed,
by disconnecting the silicon tube from the
pressure test point, the earth cable and with-
drawing the ignition lead once disconnected
from the controller.
The gas injector can be inspected and replaced
if contaminated or blocked.
STEP 3
When replacing the gas injector use a 12mm
spanner and ensure approved thread sealant
is used.
Refit the casting following the above procedure
in reverse and replace the gaskets to ensure
effective sealing.
4.5 Burner head and electrode servicing
STEP 1
Check the pepper pot burner head for contam-
ination. If necessary this can be removed. It
can be cleaned together with the Inside of the
burner head.
The pepper pot burner head can be replaced if
necessary ensuring the 5 holes on the outer ring
are aligned alongside the probes.
STEP 2
The condition of the igniter assembly can be
checked for deterioration. However, we advise
replacement at each service to ensure continued
reliability. Detach the electrode assembly from
the burner head by removing the two screws
and disconnecting the leads.
Refit the electrode assembly in the reverse order,
making sure to connect the leads securely.
Check the positions and spark gap as shown
in Figure 57
The burner assembly is ready to refit after
servicing the combustion fan and the radiant
tube assembly.
Figure 57.
Burner head detail
48
Summary of Contents for VS15LHE8
Page 34: ...A Figure 41 Vision Heater Assembly Models VSUTE VSUHE 15kW 76mm 3ins Nom Dia 34...
Page 35: ...A A Figure 42 Vision Heater Assembly Models VSUTE VSUHE 20 25kW 76mm 3ins Nom Dia 35...
Page 36: ...Figure 43 Vision Heater Assembly Models VSUTE VSUHE 30 35kW 100mm 4ins Nom Dia 36...
Page 37: ...Figure 44 Vision Heater Assembly Models VSUTE VSUHE 40kW 100mm 4ins Nom Dia 37...
Page 38: ...Figure 45 Vision Heater Assembly Models VSUTE VSUHE 45 50kW 100mm 4ins Nom Dia 38...
Page 39: ...A Figure 46 Vision Heater Assembly Models VSLIE VSLHE VSDLE 15 25kW 8m 76mm 3ins Nom Dia 39...
Page 40: ...A Figure 47 Vision Heater Assembly Models VSLIE VSLHE VSDLE 20 25kW 10 5m 76mm 3ins Nom Dia 40...
Page 41: ...Figure 48 Vision Heater Assembly Models VSLIE VSLHE VSDLE 30 35kW 10 5m 100mm 4ins Nom Dia 41...
Page 43: ...Figure 50 Vision Heater Assy Models VSLIE VSLHE VSDLE 35 40 45 50 kW 16m 100mm 4ins Nom Dia 43...
Page 59: ...Notes 59...