4.8.7.
Connection of the combustion gas exhaust
pipe
S
Insertion depth 3 cm
Mounting
1. Fit the combustion product discharge conduit.
2. Fit together the combustion gas exhaust pipes, without welding.
4
The pipes must allow no leakage of flue gases and be
resistant to corrosion.
4
Connect the pipes together without stress between
the sections.
4
The horizontal sections need to be constructed with a
gradient of 50 mm per metre: Boiler orientation.
Material
A rigid wall
(1)
Thick aluminium wall
Approval according to EN-1856-1
Stainless steel
Approval according to EN-1856-1
Synthetic material T120 Approval according to Gastec
QA or KOMO
Flexible
(1)
Stainless steel
Approval according to EN-1856-1
Synthetic material T120 Approval according to Gastec
QA or KOMO
(1) The sealing must conform with pressure class 1
4.8.8.
Connection of the air intake pipe
S
Insertion depth 3 cm
Mounting
1. Fit the air-intake conduit.
2. Fit the air-intake conduits together without welding.
4
The pipes must allow no leakage of flue gases and be
resistant to corrosion.
4
Connect the pipes together without stress between
the sections.
4
The horizontal sections need to be constructed with a
gradient: Downwards in the direction of the supply
opening.
Material
A rigid wall
aluminium/Stainless steel/Synthetic material
Flexible
T001512-A
80mm
S
T001513-A
80mm
S
4. Installation
Calenta 25s - 28c - 35s - 40c
38
040412 - 7600585-01