Once inspection and cleaning is complete reinstall the tube fitting with drain orifice and the drain
tubing from the bottom of the heart tube and the jet mixer
With a new flange gasket, use the flange studs and nuts to install the heater bundle into the
heater vessel. Gasket p/n 40500060
Reinstall the gable glands into the heater and high temperature terminal enclosures. Connect the
power wiring to the heater terminals. Reinstall terminal cover.
Connect the thermocouple wire to the terminals in the thermocouple terminal enclosure. Take
care to observe proper connections for (+) and (-) terminations. Reinstall terminal cover.
Install the cap on the drain valve in the bottom of the heater vessel and insure that the drain valve
is in the close position.
Take care to guard against pinching and crushing
hazards when handling the heater bundle.
NOTICE:
All electrical connections should only be made by a qualified
personnel
.
Ensure that all enclosure covers are securely
installed.
WARNING
WARNING
Use suitable transport equipment for removing the
heater bundle from the heater vessel, lifting and
re-installing the heater into the heater vessel.
Ensure that the heater is secured prior to and
during lifting and transport. Stand clear of the all
equipment while being maneuvered. Crane and
fork truck operators should be properly trained in
there operation.
Heater approximate weight is 84 Kg (185 pounds)