THERMOJET
®
G-3700E SERIES
OIL PURIFIER SYSTEM
INSTALLATION AND OPERATING MANUAL
Doc #
77740151
Rev
03
Date
June 2020
Page
32
of
111
Open the Controller Enclosure and interchange any two of the three incoming power supply leads
at the circuit breaker. Ensure all cable terminations are secure before closing and securing the
enclosure door with all bolts.
Turn the Circuit Breaker handle to the ON position, and again use the ON-OFF Selector Switch to
jog the electric motor and verify proper motor rotation. Once the motor rotation is correct leave
the Selector Switch in the ON position and allow the motor to run.
Ensure that all sources of electrical power are
disconnected before opening the controller.
Failure to do so may result in serious injury or
even death
.
To avoid risk of explosion hazard, the Controller
Enclosure cover must be securely closed with the
supplied fasteners.
WARNING
Circuit Breaker in ON Position
Use ON-OFF Selector Switch to
jog Motor