City Series
|
23
installation
25.
Extended framing kit only
: Install the left and right bottom cover.
The left and right bottom covers are installed with 4 screws each.
%RWWRPFRYHU
Extended framing kit bottom cover install
Bottom cover
%
%
/()76,'(
+
18. Swing Part N (x2) and Part O (x2) out from B2 + B3.
19. Part N (L) will be secured to B3 - LEFT side assembly and Part L
with 4 screws in total.
20. Part N (R) will be secured to B3 - RIGHT side assembly and Part L
with 4 screws in total.
21. Part O (L) will be secured to B2- LEFT side assembly and Part H
(top) with 4 screws in total.
22. Part O (R) will be secured to B2- RIGHT side assembly and Part H
(top) with 4 screws in total.
23. Attach corner brace Part P to the LEFT side and lower Part H with
2 screws from the top.
24. Attach the opposite corner brace Part P to the RIGHT side and lower
Part H with 2 screws from the top.
Swing Parts N + O out and attach
Attach Part P (Left) to the LEFT SIDE + H1
Attach Part P (Right) to the RIGHT SIDE + H1
Summary of Contents for City Series CB40E-LP
Page 86: ...86 City Series parts list 7 8 9 2 1 3 6 4 5 12 17 27 19 20 18 22 6a 26 24 23 25 11 ...
Page 89: ...City Series 89 parts list 16 12 22 21 18 20 19 9 26 25 8 11 26 16 16 6 23 5A 27 17 16 ...
Page 90: ...90 City Series notes ...
Page 95: ......
Page 96: ...96 City Series notes ...
Page 97: ...City Series 97 notes ...
Page 98: ...98 City Series notes ...
Page 99: ......