www.reechcraft.com/PowerMast
888-600-6160
37
secti
On
Important:
Be sure to have a tie at the top of the tower to ensure stability.
Always keep an evenly distributed load on the platform while erecting. An
unbalanced load could result in a curved tower installation.
Finish Erecting the Tower
Finish the tie installation by securing the twist lock flanges on the front mast.
Note
: It is recommended to use a bar clamp or ratchet strap to pull the middle
mast to the tie so both hands can be used to align and tighten the connection
hardware. (See Fig. 1.11 for maximum platform heights.)
Fig. 1.19
MUST be a tie at the
top of the tower!
ERECTING THE SYSTEM: FREE-STANDING BASE SPECIAL INSTRUCTIONS
3