www.reechcraft.com/PowerMast
888-600-6160
23
secti
On
3
ERECTING THE SYSTEM
1. Erection should only be carried out by a competent person, and in
compliance with all local, state, and federal requirements.
2. Refer to the layout plan to determine the complete list of equipment
required for erection. Be sure all components have been inspected and
maintained in accordance with product labels on the unit and
information contained in this manual, or any other documents supplied
by ReechCraft technical team.
3. Fasten Tie to Mast near the top with two 3/8 x 3/4 in. screws and hand
tighten.
ERECT BASE UNIT
Fig. 3.4 Fasten Tie to Mast
Install 3/8 x 3/4
screws into
mast tie plate