www.reechcraft.com/powerlift
888-600-6160
33
Elevate the climbing unit approximately 3 in. (80 mm) past the top of the mast
and carefully remove the mast section from its stowed position.
Unpowered Decent
The platform Manual Decent Crank (See Figure 2-5) is provided to:
Allow the machine operator to lower the platform in the event that the drill
motor loses power or contains insufficient power to lower the platform.
For emergency operation please see section 4 - Emergency Procedures.
Figure 3-7
Separating Mast Sections
4.
Carefully return to the stowed
position.
Separating Mast Sections
1.
Press both cam levers inward
to allow the cam lever lock to
rotate freely.
2.
Rotate the cam lever lock until
it stops in the center position.
3.
Release the cam levers to the
open position.
Cam
Lever
Cam
Lever
Lock
SECTI
ON
3
MACHINE OPERATION
www.industrialproducts.com | [email protected] | 888-243-3339