RDL-3000
INSTALLATION GUIDELINES
70-00159-01-06
Proprietary Redline Communications © 2012
Page
25
of 65
kune 12, 2012
4.2.2
Customer Supplied Materials
Installation of the RDL-3000 equipment requires additional equipment and materials
supplied by the customer and/or installer. The following list is provided as a guideline
only, and additional materials may be required based on local conditions at each
installation site. This list is not comprehensive and is provided as a guide only.
Table 9: Materials - Customer-Supplied Items
1
Equipment
Rack
Mounting space allocated for the PoE power adapter. Must
accommodate 2 m (6') AC power cable and routing of Ethernet cable
from PoE to local Ethernet network access point.
2
120/240 VAC
Power
Reliable 120/240 VAC. Total power requirements must be evaluated
based on individual site configurations.
3
Cat-5 Ethernet
Cables
Connect from PoE power adapter to core network.
4
Cable
Installation
Materials
Materials for securing cables to mast, protecting cables from abrasion,
etc. including suggested weatherproofing materials:
Scotch 2200 series of vinyl mastic rolls
Scotch 130C linerless rubber splicing tape
3M Scotch super 88 electrical tape
Rubber mastic putty or duct sealing putty
5
Radio/Antenna
Mast
Mast or tower location as required by site survey. Equipment must be
rated for weight and wind loading of all installed radios and antennas.
6
Ground Block
Termination for grounding and shield of all conductive cables entering
the building.
7
Grounding
Wire
Master grounding system for all indoor and outdoor equipment, with #2
AWG through #6 AWG as required and eye-terminals for connection to
RDL-3000 chassis and mounting bracket.
8
Tools
i) Precision set of screwdrivers, cutter pliers, and other common
installation tools.
ii) Portable computer (Windows™) for RDL-3000 configuration, antenna
alignment, and troubleshooting as required..