53
u
u
k
53
7 - INSTALLATION AND ASSEMBLY OF TANK
Technical Dept. - All rights reserved - Reproduction is prohibited
d) hydraulic connection of the tank to the boiler
After installing the circulator kit simply remove the two flexible pipes in the pellet tank and connect them to the two pipes in the boiler.
•
Remove the flexible pipes.
•
Find the gasket “
k
” (provided).
•
Identify the flexible pipe with red marking “
u
” and connect it to the relative one of the boiler using gasket “
k
”.
Summary of Contents for LOGIKA 25
Page 79: ......