31
g
h
h
g
K
K
31
6 - INSTALLATION AND ASSEMBLY OF BOILER
Technical Dept. - All rights reserved - Reproduction is prohibited
Remove both the augers (
K
) from the package containing the automatic ash cleaning kit. At this point, remove screw “
h
” (spanner 10)
and remove carrier “
g
”.
Attention!!
The auger is now no longer secured. To move it, hold it at the front with one hand to avoid dropping it.
Summary of Contents for LOGIKA 25
Page 79: ......