60
6
7
5
3
1
2
4
60
8 - ASSEMBLY OF BOILER AESTHETICS UNIT
i) hydraulic connection between tank and water mains (supply-return-sanitary-filling)
(RESPONSIBILITY OF SPECIALISED HYDRAULIC TECHNICIAN)
l) hydraulic supply to boiler and checking for leaks
(RESPONSIBILITY OF SPECIALISED HYDRAULIC TECHNICIAN).
k) assembly of aesthetics unit of boiler
After completing steps “
i
” and “
l
”, assemble the aesthetics unit of the boiler.
For convenience, the panels are identified with the numbers in the picture.
BOILER AESTHETICS UNIT
Summary of Contents for LOGIKA 25
Page 79: ......