63
1
2
g
g
z
b
a
63
8 - ASSEMBLY OF BOILER AESTHETICS UNIT
Technical Dept. - All rights reserved - Reproduction is prohibited
At this point, locate the two top doors “
1
” and “
2
” and fasten them onto the boiler. Doors “
1
” and “
2
” are already fitted with hinges. Fasten
the two hinges “
z
” onto the structure of the boiler using the holes “
g
” and screws provided in the package of the manual/refill tank.
ASSEMBLY OF TOP DOORS OF BOILER
Tools: Screwer with cross insert "
a
" or Phillips screwdriver
"
b
".
Summary of Contents for LOGIKA 25
Page 79: ......