G-Series Installation & Commissioning
40
See also
•
For more detailed installation information refer to the separate
users guide supplied with the display.
•
Ensure you record connections to the GPM400 on the schemat-
ic diagram. See
Appendix B - Nav Station schematic
.
4.5
Keyboard connections
The G-Series Keyboard communicates using the SeaTalk
ng
sys-
tem. It may be connected directly to the backbone (wired) or use a
remote basestation (wireless).
Note:
You should have at least one permanently wired keyboard.
In the event that any wireless keyboards are lost, the wired
keyboard can be used to control the system.
Maximum quantity of Keyboards
The G-Series system will support up to 8 keyboards.
Schematic diagram
When connecting a keyboard to the system, record its details on
your system/schematic diagram. You will need this information dur-
ing commissioning. (See
Appendix B
for sample diagrams.)
Wired keyboard system
Power cable extension
Not supplied
You may extend the power cable
if required. See
page 35
.
See
Appendix C
for other cables and accessories.
Cable
Part No
Notes
Monitor
Keyboard
D10068-1
SeaTalk
ng
backbone
Sea
Ta
lk
ng
spur
Sea
Ta
lk
ng
spur
GPM 400
9
WXYZ
8
TUV
7
PQRS
4
GHI
5
JKL
6
MNO
ACTIVE
WPTS
MOB
DATA
MENU
PAGE
.
0
2
ABC
3
DEF
1
CANCEL
STANDBY
DODGE
PILOT
OK
RANGE
OUT
IN
ENTER
Summary of Contents for G-Series system
Page 1: ...G Series Systems Installation and Commissioning Instructions...
Page 2: ......
Page 3: ...G Series System Installation Commissioning Instructions Document Number 87070_1 Date June 2007...
Page 6: ...G Series Installation Commissioning 6...
Page 10: ...G Series Installation Commissioning 10...
Page 14: ...G Series Installation Commissioning 14...
Page 30: ...G Series Installation Commissioning 30...
Page 56: ...G Series Installation Commissioning 56...
Page 68: ...G Series Installation Commissioning 68...
Page 72: ...G Series Installation Commissioning 72...
Page 80: ...G Series Installation Commissioning 80...
Page 102: ...G Series Installation Commissioning 102...
Page 108: ...G Series Installation Commissioning 108...
Page 120: ...G Series Installation Commissioning 120...
Page 126: ...G Series Installation Commissioning 126...
Page 127: ......