7
Chapter 7: Initial Setup
This chapter provides information for the initial setup of a new system
Chapter contents
•
7.1 Power up the system on page 74
•
7.3 Select Master GPM on page 75
•
7.2 First time configuration on page 74
•
7.4 Configure Nav Stations on page 77
•
7.5 Assign Keyboards on page 78
Schematic diagram
You will need details of the equipment connections and serial numbers. You should have entered these onto
the Nav Station schematic diagrams during the installation.
Nav station information
Nav station name
Nav station location
D10029-1
Display 1
Display 2 (if applicable)
Keyboard
GPM400 processor
9
WXYZ
8
TUV
7
PQRS
4
GHI
5
JKL
6
MNO
ACTIVE
WPTS
MOB
DATA
MENU
PAGE
.
0
2
ABC
3
DEF
1
CANCEL
STANDBY
DODGE
PILOT
OK
RANGE
OUT
IN
ENTER
SeaTalk
ng
Serial number
Location
Wireless (delete as appropriate)
YES / NO
Master GPM (delete as appropriate)
YES / NO
Master GPM (delete as appropriate)
YES / NO
SeaTalk
hs
(delete as appropriate)
SeaTalk
hs
switch
Name
Location
IP address (When on SeaTalk
hs
only)
Video connection (delete as appropriate)
DVI / VGA
YES / NO
SeaTalk
hs
(delete as appropriate)
Name
Location
IP address (When on SeaTalk
hs
only)
Video connection (delete as appropriate)
DVI / VGA
YES / NO
Serial Number
Location
Serial number
Location
GPM400 processor
Serial number
Location
Bridge - Right
Bridge
Bridge
10-2-0-14
-
-
-
-
-
10-2-0-2
Bridge - Left
1006021
1006024
Left (switch cupboard)
Right (switch cupboard)
02070016
Bridge
-
-
Bridge nav
Bridge
Summary of Contents for G-Series system
Page 1: ...G Series Systems Installation and Commissioning Instructions...
Page 2: ......
Page 3: ...G Series System Installation Commissioning Instructions Document Number 87070_1 Date June 2007...
Page 6: ...G Series Installation Commissioning 6...
Page 10: ...G Series Installation Commissioning 10...
Page 14: ...G Series Installation Commissioning 14...
Page 30: ...G Series Installation Commissioning 30...
Page 56: ...G Series Installation Commissioning 56...
Page 68: ...G Series Installation Commissioning 68...
Page 72: ...G Series Installation Commissioning 72...
Page 80: ...G Series Installation Commissioning 80...
Page 102: ...G Series Installation Commissioning 102...
Page 108: ...G Series Installation Commissioning 108...
Page 120: ...G Series Installation Commissioning 120...
Page 126: ...G Series Installation Commissioning 126...
Page 127: ......