Mounting and environment
The following conditions apply:
•
Do NOT install near sources of heat or vibration (e.g. engine).
•
The unit is NOT designed for use in a sealed enclosure. Access
to the unit is required, e.g. for chart updates.
•
Must be mounted on a vertical surface. Sides and top must be
level.
•
Mounting surface must be firm, secure and capable of support-
ing the weight of the unit.
•
Install below decks in a dry area.
•
Install the unit well away from potential sources of ignition.
Mounting clearances
Allow the following clearances from other equipment and surfaces.
Cables
•
Minimum bend radius of 100 mm (3.94 in)
•
All cables must be secured within 150 mm (5.91 in) of the unit.
This will prevent undue strain on the connectors.
See also
Ensure you record connections to the GPM400 on the schematic
diagram. See
Appendix B - Nav Station schematic
.
For connection details, see
page 31
.
5.3
G-Series Keyboard
The Keyboard can be installed for 2 different types of use:
•
Wired operation (flush mounted).
•
Wireless operation, using the wireless upgrade kit and
SeaTalk
ng
basestation.
Note:
You should have at least one permanently wired keyboard.
In the event that any wireless keyboards are lost, the wired
keyboard can be used to control the system.
Side
Distance
Top
100 mm (3.94 in)
Left
100 mm (3.94 in)
Right
100 mm (3.94 in)
Bottom
To allow cable entry
Front
150 mm (5.91 in)
Summary of Contents for G-Series system
Page 1: ...G Series Systems Installation and Commissioning Instructions...
Page 2: ......
Page 3: ...G Series System Installation Commissioning Instructions Document Number 87070_1 Date June 2007...
Page 6: ...G Series Installation Commissioning 6...
Page 10: ...G Series Installation Commissioning 10...
Page 14: ...G Series Installation Commissioning 14...
Page 30: ...G Series Installation Commissioning 30...
Page 56: ...G Series Installation Commissioning 56...
Page 68: ...G Series Installation Commissioning 68...
Page 72: ...G Series Installation Commissioning 72...
Page 80: ...G Series Installation Commissioning 80...
Page 102: ...G Series Installation Commissioning 102...
Page 108: ...G Series Installation Commissioning 108...
Page 120: ...G Series Installation Commissioning 120...
Page 126: ...G Series Installation Commissioning 126...
Page 127: ......