G-Series Installation & Commissioning
50
4.9
SeaTalk & Alarm connection
The alarm output and SeaTalk are combined into a single connec-
tor. This includes a 12 V fused power supply.
Alarm output
The alarm output is used to alert the operator to alarms and other
audible warnings.
Note:
Alarms are global and as such will be sounded across all
audio and alarm outputs across the system.
SeaTalk connection
The SeaTalk connection allows the G-Series system to receive
data from Raymarine SeaTalk compatible devices such as:
•
Autopilot
The G-Series can receive and display autopilot information and
act as a repeat controller. Refer to the separate reference guide
for operation details.
•
Instruments
The G-Series can receive and display data received from instru-
ments, such as wind, speed and depth.
•
GPS
Required for chart applications.
Master GPM
The SeaTalk bus must be connected to the Master GPM (see
page 37
).
Note:
SeaTalk connection to other GPMs for the purposes of
redundancy is allowed.
12 V power supply
The SeaTalk connection provides a 12 V supply rated at 125 mA.
This is suitable to supply 1 sounder module.
Note:
SeaTalk instruments will usually be powered from a sepa-
rate power supply, e.g from a Raymarine autopilot course
computer. You should not power a SeaTalk bus from more
than one supply.
Alarm
Alarm
Red
Black
Red
Black
No other SeaTalk
devices connected
Other SeaTalk
devices connected
Red
Black
Brown
White
White
Brown
Black
Red
Y
ellow
Drain
SeaT
alk/Alarm
Drain
Yellow
Other
SeaTalk
devices
12v
supply
GPM 400
D10144-1
or
Summary of Contents for G-Series system
Page 1: ...G Series Systems Installation and Commissioning Instructions...
Page 2: ......
Page 3: ...G Series System Installation Commissioning Instructions Document Number 87070_1 Date June 2007...
Page 6: ...G Series Installation Commissioning 6...
Page 10: ...G Series Installation Commissioning 10...
Page 14: ...G Series Installation Commissioning 14...
Page 30: ...G Series Installation Commissioning 30...
Page 56: ...G Series Installation Commissioning 56...
Page 68: ...G Series Installation Commissioning 68...
Page 72: ...G Series Installation Commissioning 72...
Page 80: ...G Series Installation Commissioning 80...
Page 102: ...G Series Installation Commissioning 102...
Page 108: ...G Series Installation Commissioning 108...
Page 120: ...G Series Installation Commissioning 120...
Page 126: ...G Series Installation Commissioning 126...
Page 127: ......