Service Manual
Setup
dĞƌŵŝŶĂƚŽƌ^ĂůǀĂƚŝŽŶΡŽƉLJƌŝŐŚƚΞϮϬ
10 T Asset Acquisition Company, LLC
Page 6
Setup
Unpack Materials
1.
Place the shipping crates on a flat, stable surface.
2.
Cut the banding straps and remove the cardboard lids.
3.
Lift off the large cardboard containers surrounding the front pedestal and monitor assemblies
and remove any shipping cleats.
4.
With at least two people, remove the front pedestal and monitor assemblies from the pallets.
5.
Remove any additional banding from the monitor assembly.
6.
Set aside the box with the Terminator head.
7.
Set aside the box with the side caps.
8.
Dispose of any bubble wrap and other packing materials.
9.
Remove the coin door key from the coin return chute.
10.
Open the top coin door.
11.
Locate the key for the back door and the cash box door.
12.
Open the cash box door and remove the cash box.
13.
Remove the items inside the cash box, including this service manual, an AC line cord, a bag of
screws, nuts and tools and a warranty card.
14.
With at least one assistant, roll the monitor assembly to a suitable playing area.
Note: keep the monitor assembly about eight inches from the wall.
P
ROXIMITY TO
N
EON
L
IGHTS
Locating the game cabinet near neon lights may reduce the ability of the IR sensors to accurately track the
guns. Place the cabinet far away from neon lights or turn off any nearby neon lights.
15.
With at least one assistant, roll the front pedestal assembly about a foot in front of the monitor
assembly.
16.
Remove packing material from the guns.
17.
Check the AC line cord for visible signs of damage.
Pay particular attention to the plug and line cord insulation.
18.
Open the boxes with the Terminator head and side caps and remove all items.
19.
Check for shipping damage to the following:
x
Left and right guns, cables and decals
x
Cabinet glass: marquee and monitor
x
Cabinet decals, back door and coin door
x
Terminator head assembly
x
Side caps (two each of two types)