5.5.4
5.5.5
5.5.6
Fig. 33
insert the flue assembly into the wall, being
careful to make sure that the outer air duct
comes flush to the inner surface of the wall.
Lift the boiler on to the wall (Fig. 34), loca-
ting onto the top coach bolts. Fit the two
lower coach bolts and tighten all four secu-
ring bolts.
Working above the boiler pull the flue
exhaust duct towards the boiler in order to
engage tube 61 into its header 56A (Fig.
31-35).
5.5.8
Fit terminal cover plate if required.
5.5.9
Extension kits are available on order for flue
extension of up to 3.5 metres total length
(Fig. 31).
Fig. 35
Fig. 34
Fig. 37
Summary of Contents for RSF 82E
Page 39: ...Fig 93 Fig 91...
Page 42: ...SECTION 9 ELECTRICAL SYSTEM DIAGRAM Fig 94...
Page 43: ...44...
Page 44: ...45...
Page 45: ...46...
Page 46: ...SECTlON IO EXPLODED PARTS DIAGRAM...
Page 49: ...NOTES...
Page 50: ...Chartists Way Morley Leeds LS27 9ET Telephone 0113 252 7007 Tfax 0113 238 0229...