![Raven Sidekick Pro Installation & Operation Manual Download Page 12](http://html2.mh-extra.com/html/raven/sidekick-pro/sidekick-pro_installation-and-operation-manual_3847237012.webp)
CHAPTER 3
10
SideKick Pro™ ICD 1-40 oz./min. and 5-200 oz./min. Installation & Operation Manual
FIGURE 3. Rinse Assist System
FAST RATE RESPONSE
High precision sensing allows the Sidekick Pro™ ICD direct injection system to dynamically lock onto the target
rate while the application equipment works the field. This ensures that the injection pump is providing the proper
chemical concentration throughout the field regardless of vehicle speed or boom section status changes.
INTEGRATED MOTOR CONTROL ECU
Sidekick Pro™ ICD features an integrated motor control ECU mounted directly on the pump housing for simplified
installation and enhanced performance. The control ECU features status LEDs for calibrating or system
troubleshooting.
INTEGRATED CALIBRATION SWITCH (FOR USE WITH PUMP CALIBRATOR ASSEMBLY ONLY)
The integrated motor control ECU also features a sealed calibration switch. The sealed calibration switch allows the
operator to begin the pump calibration process by passing a magnetic metallic object, such as a screwdriver,
across the switch sensor on the Sidekick Pro™ ICD injection pump. This feature allows the operator to run multiple
calibration tests quickly and easily and ensure the system is ready for operation.
NOTE:
Calibration also must be initiated from the universal terminal (UT) in the vehicle cab. See the
Calibration with Pump Calibrator
section on page 38 for a detailed calibration procedure.
The Calibration switch state LED light will flash when the calibration sensor registers a metallic object by the switch.
Pass the metal object past the sensor twice to initiate a pump calibration.