
5
Manual No. 016-0171-122 Rev. E
53
WIRING INSTALLATION
FIGURE 14. Existing CAN Terminator
4. Connect the CAN BUS connector on the AutoBoom power/CAN cable to the open connector on the machine’s
harness.
5. Install the terminator on the TERMINATOR connection of the AutoBoom power/CAN cable.
FIGURE 15. CAN PWR Connector
6. Locate the machine’s CAN PWR connection outside of the node box.
7. Remove the cap from the CAN PWR connection.
8. Connect the SW PWR connector of the AutoBoom power/CAN cable to the machine’s CAN PWR connector.
9. Route the remaining AutoBoom power/CAN cable along the machine’s existing cabling and toward the battery
box at the front of the machine.
10. Install the high current power and ground wires on the power cable to the power and ground studs located in
the machine’s battery box.
Summary of Contents for AutoBoom UltraGlide XT
Page 39: ...3 Manual No 016 0171 122 Rev E 35 HYDRAULIC SYSTEM INSTALLATION HYDRAULIC SCHEMATIC ...
Page 40: ...CHAPTER 3 36 Viper Pro Installation Operation Manual ...
Page 64: ...CHAPTER 5 60 Viper Pro Installation Operation Manual WIRING DIAGRAM 2009 WIRING SCHEMATIC ...
Page 65: ...5 Manual No 016 0171 122 Rev E 61 WIRING INSTALLATION 2010 2011 WIRING SCHEMATIC ...
Page 66: ...CHAPTER 5 62 Viper Pro Installation Operation Manual 2012 NEWER WIRING SCHEMATIC ...
Page 67: ...5 Manual No 016 0171 122 Rev E 63 WIRING INSTALLATION ...
Page 68: ...CHAPTER 5 64 Viper Pro Installation Operation Manual ...